2012-11-21   Supply and installation of coal transport system - stage 2 for the 600 MW unit 6 at Šoštanj Thermal Power Plant (Termoelektrarna Šoštanj d.o.o.)
Design, manufacture, supply, installation and commissioning of plant and equipment of the coal transport system - stage 2 for the new 600 MW Unit 6 at Thermal Power Plant Šoštanj, Slovenia. Oglejte si javna naročila »
Omenjeni dobavitelji: Rudis d.o.o.
2011-12-20   Supply and installation of coal transport system (Termoelektrarna Šoštanj d.o.o.)
Design, manufacture, supply, installation and commissioning of plant and equipment of the coal transport system for the new 600 MW Unit 6 at thermal power plant Šoštanj, Slovenia. Oglejte si javna naročila »
2011-08-05   Sistem transporta premoga (Termoelektrarna Šoštanj d.o.o.)
Dobava in montaža sistema transporta premoga za novi 600 MW blok 6 v TE Šoštanj - projektiranje, izdelava, preizkusi, dobava, montaža, zagon in odprava napak. Oglejte si javna naročila »